Previous Jobs

Settlement Road, Papakura

December 2019 – June 2020 (Hick Bros)
  • Trench & lay stormwater & wastewater lines, manholes and connections for 41 super lots.
  • 248m of stormwater pipe, 100ø – 300ø, depths ranging from 1 – 4m.
  • 730m of wastewater Pipe, 100ø – 150ø, depths ranging from 1 – 7m.
  • Catch pits and raingarden excavation and installation.

Glenmore Road, Sunnyhills

June 2020 (Greenway)
  • 30m of stormwater pipe, 100ø – 150ø, depths ranging from 1 – 3m.
  • 30m of wastewater Pipe, 100ø – 150ø, depths ranging from 1 – 3m.
  • Installing new manhole over existing wastewater line.

Ohaaki Marae, Taupo

July 2019 (Hick Bros & Contact Energy)
  • New stormwater outlets to live river.
  • Duck valves for stormwater outlets
  • Construct Pond and riprap outlets.

Settlement Road, Papakura

April 2019 – December 2019 (Hick Bros)
  • Getting stormwater and wastewater lines, connections and manholes to Watercare (Veolia) and Auckland council standard
  • Remedial work of 44 stormwater manholes and 37 wastewater manholes.
  • Remedial work of catch pits and rain gardens.
  • Preparing and boxing footpaths and driveways for concrete.
  • Stopping leaks in manholes.
  • Finding leaks in wastewater lines and repairing them.

Thomas Road, Flat Bush

November 2018 – May 2019 (Hick Bros)
  • Trench & Lay Stormwater & Wastewater lines, manholes and connections for 86 lots.
  • 761m of Stormwater pipe, 100ø – 675ø, Depths ranging from 1 – 7m.
  • 719m of Wastewater Pipe, 100ø – 150ø, Depths ranging from 1 – 4m.
  • Catch pits and raingarden excavation and installation.
  • Counterfort drain outlets.

Playfair Road & Richardson Road, Mt Roskill

September 2018 - October 2018 (JFC & Level Civil)
  • Trench & lay stormwater & wastewater lines, manholes and connections for 86 lots.
  • Stormwater pipe, 100ø – 1500ø, depths ranging from 1 –4m.
  • Wastewater pipe, 100ø – 150ø, depths ranging from 1 – 4m.
  • Working in close areas
  • Working around live services
  • New manholes over existing stormwater and wastewater line.

Manukau Golf Course, Manukau

June 2018 – August 2018 (Hick Bros)
  • Trench & Lay Stormwater & Wastewater lines, manholes and connections with very flat grades.
  • Stormwater pipe, 100ø – 675ø, Depths ranging from 1 – 3m.
  • Wastewater Pipe, 100ø – 150ø, Depths ranging from 1 – 3m.
  • Catch pits excavation and installation.

Weiti Bay, Redvale

October 2017 – June 2018 (Hick Bros)
  • Trench & Lay Stormwater & Wastewater lines, manholes and connections with very steep grades.
  • Stormwater pipe, 100ø – 675ø, Depths ranging from 1 – 7m.
  • Wastewater Pipe, 100ø – 225ø, Depths ranging from 1 – 7m.
  • Across Valleys and up Hills
  • Catch pits excavation and installation.